Skip to main content
Free guide

The 10 mistakes that blow a mapping project budget

The free guide to secure your project before you start

BAPTISTE JAZÉ

The 10 mistakes that blow your budget

The 10 mistakes to avoid:

  • #1Underestimating the required light output
  • #2Skipping the feasibility study before signing
  • #3Ignoring surface constraints
  • #4Choosing a media server unsuited to the project
  • #5Neglecting redundancy
  • #6Making poor codec choices for media files
  • #7Underestimating on-site calibration time
  • #8Skipping the 3D scan
  • #9Entrusting critical technical aspects to non-experts
  • #10Not having a dedicated technical point of contact
How to avoid the most costly mistakes
Best practices from experienced professionals
Practical, actionable advice

Get the free guide by email

The PDF will arrive in your inbox within minutes

By receiving this guide, you agree to receive tips by email. You can unsubscribe at any time.

100% freeNo spam

© 2026 Baptiste Jazé — Video projection & mapping expert